Master Timeline

Use this page as the full SAT sequence map.

For the exact folio items required in each assessment block, use the Assessment Block Checklists page.

Block Weeks Main focus Observation Submission
1 Term 1 Week 10 to Term 2 Week 1 Problem, need or opportunity, brief and proposed Gantt chart Term 1 Week 10 Term 2 Week 1
2 Term 2 Week 1 to Week 3 Data collection and analytical tools Term 2 Week 2 Term 2 Week 3
3 Term 2 Week 3 to Week 5 Software requirements specification Term 2 Week 4 Term 2 Week 5
4 Term 2 Week 5 to Week 6 Design ideas and evaluation criteria Term 2 Week 5 Term 2 Week 6
5 Term 2 Week 6 to Week 7 Detailed design package Term 2 Week 6 Term 2 Week 7
6 From Term 2 Week 8 Unit 4 development, testing and evaluation Ongoing in Unit 4 Unit 4 assessment timeline

Weekly Flow

  1. Term 1 Week 10: confirm a feasible SAT idea, identify the client and intended users, and begin the brief and Gantt chart.
  2. Term 2 Week 1: submit Block 1, then set up the data-collection methods for Block 2.
  3. Term 2 Week 2: collect real evidence and draft the context diagram, DFD and use case diagram.
  4. Term 2 Week 3: submit Block 2, then extract requirements, constraints and scope ready for the SRS.
  5. Term 2 Week 4: draft the full SRS in a professional structure.
  6. Term 2 Week 5: submit Block 3, then generate two to three genuinely different design ideas and begin the evaluation table.
  7. Term 2 Week 6: submit Block 4, choose the preferred design and begin the detailed design package.
  8. Term 2 Week 7: submit Block 5 and the full Unit 3 Outcome 2 folio.
  9. Term 2 Week 8 onward: carry the editable Gantt chart, evaluation criteria and detailed design package into Unit 4.

Order of Work

  1. Launch and plan
  2. Collect evidence and analyse
  3. Write the SRS
  4. Generate and evaluate design ideas
  5. Produce detailed designs
  6. Build, test and evaluate